Westline Industrial Drive being reconstructed from Grissom Drive to Schuetz Road - Maryland Heights
Westline Industrial Dr. will be reconstructed from Grissom Drive to Schuetz Road in a road widening project. The widened road will provide a travel lane in each direction and a central left-turn lane. The new road will be 33 feet in width to replace an existing 26 foot wide pavement.

This entry was posted
on Thursday, December 3rd, 2009 at 3:40 pm and is filed under St. Louis.
You can follow any updates to this entry through the RSS 2.0 feed.
» Receive Updates on this Project
» Learn More About Eminent Domain